For more information:
Carla Wroten
Vice President
800.359.4467 (toll free)
707.446.7996
707.446.4906 (fax)
cwroten@cal-inc.com
Featured Projects
- GSA Alameda 9th Floor Renovation
- Construction of an ASDE-X
- Military Housing Abatement & Demolition
- Asbestos Abatement & Hazardous Materials Removal
- Demolition & Abatement Room 1202
- Link Interior Demolition
- Mold Removal/Renovation Phase 2
- Asbestos & Lead Abatement Humboldt Bay Power Plant
Company Links
Communities Served
Vacaville
Fairfield
Sacramento
Richmond
San Francisco
Vallejo
Woodland
Davis
Concord
Walnut Creek
Oakland
Yuba
Yolo
Fremont
Stockton
Modesto
Petaluma
Santa Rosa
Napa
Redding
Red Bluff
Eureka
Berkeley
Chico
Rio Vista
Antioch
Winters
Sebastapol
Novato
San Mateo
Palo Alto
Redwood City
Livermore
San Ramon
Dublin
Tracy
Calistoga
St. Helena
Marysville
Oroville
San Jose
Mountain View
Cupertino
Los Gatos
Sonoma
Solano
Sacramento
Contra Costa
Alameda
Yolo
Mendocino
San Joaquin
Marin
San Mateo
Santa Clara
Stanislaus
El Dorado
Placer
Sutter
Yuba
Butte
Glenn
Lake
Tehama
Shasta
Martinez
Antioch
Rio Vista
Pinole
San Pablo
Alameda
San Leandro
Hayward
Castro Valley
Union City
Milpitas
Sunnyvale
Santa Clara
Santa Cruz
Monterey
Burlingame
Rocklin
Roseville
Folsom
Rancho Cordova
Citrus Heights
Elk Grove
Galt
Lodi
Manteca
Tracy
Danville
Pleasanton
Merced
Fort Bragg
Colusa
Anderson
Red Bluff
Grass Valley
Nevada City
Auburn
Placerville
Paso Robles
Salinas
Lake Tahoe
Truckee
Reno
Carson City
Morgan Hill
Gilroy
Featured Project
Abatement & Demolition
Kiewit Power Constructors Company
POC:
Contract Value: Time and Materials Rate $650,000 + Change Orders
|
CAL INC is contracted by Kiewit Power Nuclear to perform abatement and remediation services for the decommissioning project at Humboldt Bay Power Plant (HBPP). Work consists of removal of all asbestos and ACM from HBPP, Unit 3 Turbine Building, passing visual inspections/air sampling tests, and making areas acceptable for occupancy and demolition.
The scope of work includes:
Removal of transite panels surround building Removal of TSI pipe penetrations through walls and floors Removal of floor tile, vinyl sheeting and associated mastics. Removal of ACM wire insulation Removal of ACM roofing and associated mastics. Removal of lead sheeting materials. Removal of CMU wall containing asbestos. Removal of ACM insulation surrounding stairwells.
Work at HBPP requires extensive safety measures. All work is performed under close watch. CAL INC has been spoken of with the highest regards on this job. Numerous emails have been sent praising CAL INC for our safe and excellent work practices. CAL INC attends daily tailboards and safety briefs with Kiewit craft before any work begins.
CAL INC is currently working on this project and PG&E is very happy about the work we have done. It has been mentioned that PG&E plans on keeping CAL INC working at the HBPP for quite some time.
|
Highlights of this Project:
|