For more information:
Carla Wroten
Vice President
800.359.4467 (toll free)
707.446.7996
707.446.4906 (fax)
cwroten@cal-inc.com
Featured Projects
- GSA Alameda 9th Floor Renovation
- Construction of an ASDE-X
- Military Housing Abatement & Demolition
- Asbestos Abatement & Hazardous Materials Removal
- Demolition & Abatement Room 1202
- Link Interior Demolition
- Mold Removal/Renovation Phase 2
- Asbestos & Lead Abatement Humboldt Bay Power Plant
Company Links
Communities Served
Vacaville
Fairfield
Sacramento
Richmond
San Francisco
Vallejo
Woodland
Davis
Concord
Walnut Creek
Oakland
Yuba
Yolo
Fremont
Stockton
Modesto
Petaluma
Santa Rosa
Napa
Redding
Red Bluff
Eureka
Berkeley
Chico
Rio Vista
Antioch
Winters
Sebastapol
Novato
San Mateo
Palo Alto
Redwood City
Livermore
San Ramon
Dublin
Tracy
Calistoga
St. Helena
Marysville
Oroville
San Jose
Mountain View
Cupertino
Los Gatos
Sonoma
Solano
Sacramento
Contra Costa
Alameda
Yolo
Mendocino
San Joaquin
Marin
San Mateo
Santa Clara
Stanislaus
El Dorado
Placer
Sutter
Yuba
Butte
Glenn
Lake
Tehama
Shasta
Martinez
Antioch
Rio Vista
Pinole
San Pablo
Alameda
San Leandro
Hayward
Castro Valley
Union City
Milpitas
Sunnyvale
Santa Clara
Santa Cruz
Monterey
Burlingame
Rocklin
Roseville
Folsom
Rancho Cordova
Citrus Heights
Elk Grove
Galt
Lodi
Manteca
Tracy
Danville
Pleasanton
Merced
Fort Bragg
Colusa
Anderson
Red Bluff
Grass Valley
Nevada City
Auburn
Placerville
Paso Robles
Salinas
Lake Tahoe
Truckee
Reno
Carson City
Morgan Hill
Gilroy
Featured Project
General Construction
Link Interior Demolition Louisville Intl' Standiford Field Airport (SDF) ATCT Louisville, KY Parsons Infrastructure & Technology Inc. 600 Maryland Avenue S.W., Suite 960W Washington, DC 20024 POC: Nathan Magestag
Contract Value: $66,531.88 |
CAL INC was contracted by Parsons Infrastructure & Technology Inc. (Parsons) to provide labor, equipment, supplies, and supervision to perform the following scope of work at the facility referenced above, located at an Covington (CVG) Air Traffic Control Tower (ATCT). The scope of work included removal of all the existing internal finishes and material including all wall covering, drywall, fiberglass insulation, flooring, suspended ceiling and ceiling grid from inside the link. CAL INC was also responsible for Furnishing and installing an exterior rated Cypher lock on the outside door on the 1st floor of the ATCT.
Highlights of this Project: Mold remediation work Work performed at a secure facility |
In 2009, 1Ci awarded a subcontract to CAL INC to perform lead and asbestos abatement and building demolition services for Building 1202 at Travis Air Force Base in Fairfield, CA. CAL INC’s scope of work included removing all hazardous materials from the building and demolishing the building, including the concrete footing. CAL INC’s scope also required hazardous waste disposal and transportation. CAL INC performed the project utilizing only certified lead and asbestos workers throughout the duration of the project.
Summary of Project:
|